We coordinate China supplier matching, quotation comparison and delivery preparation for steel building buyers. Start by separating supplier engineering, local review and procurement responsibilities.

Procurement review of shop drawings and bolted frame interfaces

Freeze the bid basis

Buyer inputs

Send a dimensioned plan with clear span, frame spacing and eave height. Mark crane travel, mezzanine reactions and door clearances on the same revision. Ask the project engineer to identify the adopted wind, snow and seismic basis for the actual site.

Supplier response

Ask each bidder to name the steel grade and section family for columns, rafters, purlins and girts. The quote should identify responsibility for anchor bolts, secondary members and bracing. Where a supplier lists a substitute grade, request its material specification and design acceptance before comparing price.

Delivery gates

01 / Match

Issue the same scope sheet to each shortlisted supplier and record open clarifications.

02 / Compare

Normalize tonnage, coating, envelope and packing before comparing landed estimates.

03 / Inspect

Coordinate agreed hold points and ask the inspector to record release exceptions.

04 / Consolidate

Confirm carton, bundle and container references with the nominated freight team.

Packing and erection interfaces

Tagged steel bundles on timber dunnage

Unload by erection sequence

A compact load can still delay an erection crew if the first frames are buried. Ask for piece marks on two accessible faces and a packing sketch showing bundle weights, lifting points and the location of temporary bracing. If a long rafter requires a splice to fit the transport envelope, have the supplier show the joint before the freight allowance is fixed.

Evidence at handover

Quotation comparison

Use the quote revision, exclusions register and a marked-up scope matrix to record commercial decisions.

Shipment evidence

Match inspection releases against the container packing list. The chosen supplier remains responsible for certificates and fabrication records; local professionals retain project approval responsibility.

Open a specification enquiry

Send the drawing revision, delivery port and critical interfaces for a supplier comparison brief.

  • Supplier shortlist
  • Comparable quotation scope
  • Packing and inspection records